Borough-ready HMO floor plans for all 32 London boroughs. Article 4 planning packs, additional and selective licensing plans, fire safety annotations and per-room occupancy. From £7.90, 6–12 hour turnaround.
London has the highest concentration of licensed HMOs in England. Unlike most regions, the majority of London boroughs operate additional licensing schemes on top of mandatory HMO licensing — meaning landlords of small shared houses (3–4 occupants) need a licence even when they wouldn't elsewhere in the country.
London is also the most Article 4-intensive city in England. Over a dozen boroughs have borough-wide or extensive ward-level Article 4 directions — meaning many London landlords need both a licensing plan AND separate planning drawings.
Where Article 4 applies, every conversion needs a planning application drawing (existing + proposed) in addition to the HMO licensing plan. Affected boroughs include Brent, Ealing, Barking & Dagenham, Croydon (part), Tower Hamlets (part), Waltham Forest (part), Lambeth (part), Lewisham (part). Our Article 4 Planning Pack delivers both from £15.80.
What's Included
Borough-Specific Plans
We check the current licensing scheme and Article 4 status before drafting every plan.
Fire Safety Annotations
FD30/FD60 fire doors, self-closers, smoke/heat alarms, escape routes marked.
Usable Room Areas
Legally compliant calculations excluding under-eaves space below 1.5m head-height.
2 Free Revisions
Revised and returned within 12 hours if the council requests changes.
6–12 Hour Turnaround
Submit before 20:00 UK time — plan ready before 08:00 the next morning.
PDF + JPEG Delivery
Sized for council submission — PDF for the application, JPEG for records.
We check the current scheme and Article 4 status for your specific address before starting every London HMO plan. Updated June 2026.
| Borough | Current Scheme | VizCraft Drafting Notes |
|---|---|---|
| Newham | Borough-wide additional & selective licensing | One of the strictest schemes in England — covers practically every HMO and shared house. |
| Waltham Forest | Borough-wide selective + additional licensing | Renewed 2023–2028. Plans must show every room area and fire safety detail. |
| Tower Hamlets | Additional & selective licensing in named wards | Plans need door types (FD30/FD60) and self-closer locations marked. |
| Hackney | Additional licensing borough-wide; selective in named wards | Particular focus on usable bedroom floor area (the 6.51 m² minimum). |
| Croydon | Additional licensing scheme renewed 2024 | Council asks for amenities mapped to occupants (kitchen units per person). |
| Brent | Additional licensing across the borough | Article 4 in effect — every C3-to-C4 change needs planning consent. |
| Ealing | Additional licensing in named wards | Article 4 covering most of the borough since 2020. |
| Haringey | Additional licensing borough-wide | Plans must distinguish bedroom vs. living-room use. |
| Southwark | Additional licensing in named wards | Council strict on stair widths and means of escape annotations. |
| Lambeth | Additional licensing in named wards | Article 4 directions cover several wards including Brixton Hill. |
| Lewisham | Additional licensing in named wards | Article 4 in named wards; HMO conversions require planning consent. |
| Greenwich | Additional licensing in named wards | Particular focus on kitchen and bathroom provisions per occupant. |
Send sketches with measurements, an existing PDF/CAD plan, photographs, or a Matterport scan. Tell us the London borough and we check the current licensing scheme + Article 4 status before drafting.
Plan drafted with usable room areas, fire doors (FD30/FD60), self-closers, escape routes, alarm positions, kitchen/bathroom provisions, and per-room occupancy — matched to the specific borough's checklist.
Borough-ready HMO plan delivered as PDF + JPEG, sized for licensing submission. Up to 2 free revisions if the council requests changes.
All prices in GBP, including up to 2 free revisions. No hidden fees.
Borough-ready HMO plan with room areas, fire safety annotations, and per-room occupancy.
Mandatory licensing for HMOs of 5+ occupants — covers most London additional schemes too.
HMO licensing plan plus existing/proposed C3→C4 planning drawings for Article 4 boroughs.
HMO plan extracted directly from a Matterport scan — ideal for occupied properties.
Borough-specific, Article 4-ready, delivered in 6–12 hours. Start with a free sample — no card required.